Tarbela Dam 4th Extension
Project Date: 2017
Client: WAPDA Tarbela
Consultant: T4 CJV Tarbela
Services Rendered: Geotechnical Investigation, Piezometer Installation
Description: We provided specialized geotechnical investigation and installed piezometers to monitor groundwater levels, contributing to the crucial expansion of the Tarbela Dam. Our work ensured that the project had the necessary geological data for a successful and secure construction.


Our Projects
Patrind Hydro Power Project, Azad Jammu & Kashmir
Project Date: 2015
Client: Daewoo
Services Rendered: Slope Protection Anchors, Shotcrete, and Drain Hole Installation
Description: On this vital hydropower project, we implemented a robust slope stabilization system using protection anchors and shotcrete. Our work was essential for mitigating geological risks and ensuring the long-term structural integrity of the site.


Mangla Dam Raising Project
Project Date: 2005-2006
Client: Water & Power Development Authority
Consultant: MJV
Services Rendered: Tie Back Ground Anchors, De-Watering Wells & Piezometer Installation
Description: As part of the Mangla Dam Raising Project, we installed high-capacity tie-back ground anchors, de-watering wells, and piezometers. Our contribution was vital to the structural integrity and long-term stability of this major national infrastructure upgrade.


Simly Dam
Project Date: 2005-2006
Client: Capital Development Authority
Consultant: Small Dam Organization
Services Rendered: Rock Core Drilling & Curtain Grouting
Description: We performed rock core drilling and curtain grouting to strengthen the existing grout curtain at Simly Dam. Our specialized work was essential in enhancing the dam's structural security and preventing seepage.


Jhika Gali, Murree
Project Date: 2010-2011
Client: C & W Department
Consultant: NESPAK
Services Rendered: Slope Stabilization Tie Back Ground Anchors (Dia 4", Tendon 4-strand wire, 950 Kn Post-Tensioning)
Description: We were contracted to execute extensive slope stabilization measures for road improvement in the challenging terrain of Jhika Gali, Murree. Our installation of high-strength ground anchors and post-tensioning was key to ensuring the safety and longevity of the road infrastructure.


Malakand Hydropower Project III
Project Date: 2002-2003
Client: CWE
Services Rendered: Permanent Drainage System, Soil Investigation (Coring), Shotcrete, Micro Piles
Description: We provided a multi-faceted solution for the Malakand Hydropower Project, including a permanent drainage system, detailed soil investigation with coring, shotcrete application, and micro pile installation for the power house. Our integrated services ensured the project's success in a complex geological environment.


Madian HydroPower Project
Project Date: 2007-2008
Client: Madian Hydro Power Ltd
Consultant: Fitcher Germany
Services Rendered: Geotechnical Investigation, Rock Core Drilling
Description: We performed an extensive geotechnical investigation, including drilling over 6,800 meters of rock core, to provide critical subsurface data for the Madian HydroPower Project. Our work informed the design of a safe and efficient power generation facility.


KalamAsrit Hydro Power Dam, Swat
Project Date: 2009-2010
Client: Techno Engineering Service (Pvt) Ltd
Consultant: RSS-Canada Designman
Services Rendered: Rock Core Drilling & Lugeon Test
Description: We conducted detailed rock core drilling and Lugeon tests to assess the geological conditions at the KalamAsrit Hydro Power Dam site. This fieldwork was fundamental to the design and safety planning of this significant hydropower project.


45 MW ABB Alsthom Project, Mangla
Project Date: 2003-2004
Client: ABB Alsthom
Services Rendered: Soil Investigation & Exploratory Drilling
Description: Our team conducted a comprehensive soil investigation and exploratory drilling (non-coring) for the 45 MW ABB Alsthom Project. The data we provided was crucial for the foundation design and successful implementation of the power plant.


Proposed Kalabagh Dam
Project Date: 1983-1985
Client: WAPDA
Consultant: Kalabagh Consultants
Services Rendered: River Channel Exploratory Drilling, SPT, and Permeability Tests
Description: Our involvement in the proposed Kalabagh Dam project included extensive exploratory drilling in the river channel and performing essential field tests, such as Standard Penetration Tests (SPT) and permeability tests, to provide critical data for the project's feasibility study.


