Tarbela Dam 4th Extension

Project Date: 2017

Client: WAPDA Tarbela

Consultant: T4 CJV Tarbela

Services Rendered: Geotechnical Investigation, Piezometer Installation

Description: We provided specialized geotechnical investigation and installed piezometers to monitor groundwater levels, contributing to the crucial expansion of the Tarbela Dam. Our work ensured that the project had the necessary geological data for a successful and secure construction.

Our Projects

Patrind Hydro Power Project, Azad Jammu & Kashmir

Project Date: 2015

Client: Daewoo

Services Rendered: Slope Protection Anchors, Shotcrete, and Drain Hole Installation

Description: On this vital hydropower project, we implemented a robust slope stabilization system using protection anchors and shotcrete. Our work was essential for mitigating geological risks and ensuring the long-term structural integrity of the site.

Mangla Dam Raising Project

Project Date: 2005-2006

Client: Water & Power Development Authority

Consultant: MJV

Services Rendered: Tie Back Ground Anchors, De-Watering Wells & Piezometer Installation

Description: As part of the Mangla Dam Raising Project, we installed high-capacity tie-back ground anchors, de-watering wells, and piezometers. Our contribution was vital to the structural integrity and long-term stability of this major national infrastructure upgrade.

Simly Dam

Project Date: 2005-2006

Client: Capital Development Authority

Consultant: Small Dam Organization

Services Rendered: Rock Core Drilling & Curtain Grouting

Description: We performed rock core drilling and curtain grouting to strengthen the existing grout curtain at Simly Dam. Our specialized work was essential in enhancing the dam's structural security and preventing seepage.

Jhika Gali, Murree

Project Date: 2010-2011

Client: C & W Department

Consultant: NESPAK

Services Rendered: Slope Stabilization Tie Back Ground Anchors (Dia 4", Tendon 4-strand wire, 950 Kn Post-Tensioning)

Description: We were contracted to execute extensive slope stabilization measures for road improvement in the challenging terrain of Jhika Gali, Murree. Our installation of high-strength ground anchors and post-tensioning was key to ensuring the safety and longevity of the road infrastructure.

Malakand Hydropower Project III

Project Date: 2002-2003

Client: CWE

Services Rendered: Permanent Drainage System, Soil Investigation (Coring), Shotcrete, Micro Piles

Description: We provided a multi-faceted solution for the Malakand Hydropower Project, including a permanent drainage system, detailed soil investigation with coring, shotcrete application, and micro pile installation for the power house. Our integrated services ensured the project's success in a complex geological environment.

Madian HydroPower Project

Project Date: 2007-2008

Client: Madian Hydro Power Ltd

Consultant: Fitcher Germany

Services Rendered: Geotechnical Investigation, Rock Core Drilling

Description: We performed an extensive geotechnical investigation, including drilling over 6,800 meters of rock core, to provide critical subsurface data for the Madian HydroPower Project. Our work informed the design of a safe and efficient power generation facility.

KalamAsrit Hydro Power Dam, Swat

Project Date: 2009-2010

Client: Techno Engineering Service (Pvt) Ltd

Consultant: RSS-Canada Designman

Services Rendered: Rock Core Drilling & Lugeon Test

Description: We conducted detailed rock core drilling and Lugeon tests to assess the geological conditions at the KalamAsrit Hydro Power Dam site. This fieldwork was fundamental to the design and safety planning of this significant hydropower project.

45 MW ABB Alsthom Project, Mangla

Project Date: 2003-2004

Client: ABB Alsthom

Services Rendered: Soil Investigation & Exploratory Drilling

Description: Our team conducted a comprehensive soil investigation and exploratory drilling (non-coring) for the 45 MW ABB Alsthom Project. The data we provided was crucial for the foundation design and successful implementation of the power plant.

Proposed Kalabagh Dam

Project Date: 1983-1985

Client: WAPDA

Consultant: Kalabagh Consultants

Services Rendered: River Channel Exploratory Drilling, SPT, and Permeability Tests

Description: Our involvement in the proposed Kalabagh Dam project included extensive exploratory drilling in the river channel and performing essential field tests, such as Standard Penetration Tests (SPT) and permeability tests, to provide critical data for the project's feasibility study.

an abstract photo of a curved building with a blue sky in the background
Address

Al-Amin Plaza
Saddar, Rawalpindi

Contacts

+92 (332) 9482270
shehryarpp12@email.com

Subscribe to our newsletter